Basic requirements of construction
The surface of the ground should be firm which means keep long service life without deformation. 15 degrees slope is a recommended as the perfect angle of slope.
Installation
- Clean the site of useless material and ensure that suitable ground protection sheet is in places.
- Rolls out the sheet ground protection and is pinned to the whole site from the top to the bottom of the slope.
- After the sub-base being fixed into the right position, and then lay the dry ski slope. Start from one side, install sole tile first, dry ski slopes are connected with each other by the special interlocking design.